Integrated Master Schedule
A single CPM schedule that ties engineering, procurement, construction and commissioning together - with logic that holds up to challenge.
Integrated master schedules, realistic baselines, and lookahead discipline that align contractors, owners, and delivery teams - so milestones stay credible and recovery options stay visible.
Why it matters
Most slipped projects don't lack effort - they lack a credible plan. We build schedules that hold up to scrutiny, drive the right conversations in the lookahead, and surface options before the float is gone.
Logic that survives challenge, durations grounded in production rates, and milestones the steering committee can defend.
Lookaheads that match how crews actually work, with constraints visible and updates that don't take a week to consolidate.
Baseline, progress and impact captured contemporaneously - so time impact and entitlement analysis has evidence behind it.
Capabilities
From greenfield baseline through recovery, here's where we plug in. Engagements scale from a few hours of senior oversight to a full-time planner embedded for the duration.
A single CPM schedule that ties engineering, procurement, construction and commissioning together - with logic that holds up to challenge.
Realistic baselines built from production rates and resource availability, then validated against contractual milestones before sign-off.
4 to 6 week lookaheads that align the field with the master schedule, with constraints, holds and readiness reviewed every week.
Earned schedule, physical % complete, and progress curves you can take to a client meeting without translation.
Monte Carlo and qualitative risk overlays that test the plan against weather, productivity, interface and resource exposure.
When slippage is real, structured recovery options - resequencing, acceleration, scope deferral - with the time and cost trade-offs spelled out.
How we engage
Our practitioners sit inside the delivery team. The schedule and the records get worked, not just reviewed - and the person who scopes the engagement is the person doing it.
We sit with the schedule, the records and the project leadership to understand what the plan is actually telling people - and where the gaps are.
Whether it's a new baseline, a re-baseline, or a stabilised live schedule, we get the plan into a state the project can run on.
We own the weekly cadence - status, lookahead, risk, reporting - alongside the project team, not from the outside.
We exit when the project's own team can sustain the discipline - with documentation, templates and a trained successor in place.
What good looks like
Tools
Primary platform is Oracle Primavera P6, with Microsoft Project, Asta Powerproject, Acumen Fuse, and bespoke reporting dashboards used where the client's environment requires.
FAQ
Tell us where the schedule is sitting today - we'll put a senior planner on a short call and map what good looks like for your project.