Project planning services

Tender programmes, baselines, WBS and planning standards, set up properly at the start of a project or rebuilt part-way through. We also review baselines and programmes prepared by others. Owner side and contractor side, from Brisbane and across Australia.

Who we plan for

We usually join at tender, during project set-up or at a re-baseline. The aim is a programme the site team can work to and the project can report against. PPSS has supported 200+ capital project engagements, and our consultants average 15+ years of experience.

  • Owner-side

    Owners and sponsors who need an independent view: programme structure, stage gates and milestones tied to contractual obligations, and baselines checked before they are accepted.

  • Contractor-side

    Contractors and delivery teams who need a baseline built from production rates and interface logic, a programme that matches how work will be sequenced on site, and reporting cadences agreed with the client early.

  • Re-baseline and recovery

    Projects where the plan no longer reflects how the work is being delivered. We check the existing baseline against progress, then build a revised or recovery programme with logic the project team and the client can follow.

What our project planning services include

Engagements range from a single tender programme or baseline review to a planner in your team for the whole set-up phase.

  • Tender and bid programmes

    Programmes for tender submissions, built from the scope, staging and resource assumptions, with enough structure to develop into the contract baseline if the work is won.

  • Programme structure and WBS

    WBS and programme structure tied to contractual obligations and to how the work will actually be sequenced on site.

  • Baseline development

    Baseline schedules built from production rates, interface logic and contractual milestones, and checked before sign-off.

  • Independent schedule reviews

    A check of logic, durations, constraints and interfaces before a baseline is locked, or of a baseline someone else built, with written findings and the changes needed.

  • Stage gates and milestones

    Gate criteria and milestone packs structured for steering committees and contractual reporting.

  • Reporting and governance frameworks

    Reporting cycles, milestone definitions and report formats agreed while the programme is still being set up, so the sponsor, client and delivery team all report the same way.

  • Re-baseline and recovery planning

    When the existing plan has drifted, we rebuild the baseline or prepare a recovery programme, with the logic and assumptions documented.

  • Primavera P6 and Microsoft Project planning

    Plans built and maintained in P6 or Microsoft Project, to your coding structure, calendars and baseline rules. P6 environment setup and administration sits with our P6 support and administration service.

  • Planning standards and handover

    Planning standards, look-ahead templates and handover documentation so the in-house team can sustain the discipline after we exit.

How a planning engagement works

PPSS is based in Brisbane and works across Australia, with travel arranged where the project needs it. Planning work can be a defined deliverable, such as a tender programme or baseline, or a planner in your team for a few hours a week up to full-time.

  1. Scope the need

    A short call with a senior planner to understand where the programme is and which side of the contract you are on. We reply inside two business days with the practitioners we would propose.

  2. Set up the programme

    Structure, WBS, stage gates, milestones and reporting cadence agreed with project leadership while the programme is still being shaped.

  3. Build and check the baseline

    The baseline built from production rates and interface logic, then reviewed before it is locked.

  4. Hand over or stay on

    Standards and templates left with your team, or the planner moves into project scheduling to run the update cycle against the baseline.

Tools

Primavera P6 and Microsoft Project

We plan in Primavera P6 and Microsoft Project, working to the coding structure, calendars and standards your project already runs.

  • Oracle Primavera P6
  • Microsoft Project

Case study

Swanbank E power station overhaul

On CleanCo’s $80 million Swanbank E overhaul in Queensland, PPSS provided scheduling and controls support covering critical path management, risk-informed scheduling and scenario planning, and baseline management and change control. The overhaul finished in late 2024.

Read the Swanbank E case study

Common questions about project planning services

Related services

Need a tender programme or a baseline?

Tell us about the project, the submission or start date, and the software you use. A senior planner will get back to you.